Monday, 4 November 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

These improvement works have now been completed.

 
 
 

THank you for your patience and understanding whilst we carried out these improvement works.

Friday, 1 November 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we completed the installation of the benches, finsished the grouting, all iron work has been set and the base course was laid to the carriageway.

Tonight we will be jet washing the whole site.

Tomorrow we will be laying the master tint to the carriageway.


Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info 

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street

Thursday, 31 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we excavated the carriageway from Pump Street to Elgar Statue, completed the grouting at Monsoon's and to all the BT Boxes, installed some of the bencehes and the Elgar plaque.

Tonight we plan to complete the installaiton of the benches and continue with the grouting. Resurfacing will be carried out approximatly 6pm - 10pm


Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street

Wednesday, 30 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we installed and grouted in all bollard cases, installed the gully opposite Fish Street and carried out more grouting.

Tonight we plan to install benches, excavate block paving to the carriageway and continue with the grouting.


Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street

Tuesday, 29 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we installed the bollards at Elgar Statue, completed the grouting to the central area, moved the illuminated sign at Pump street and cut in the slabs.

Tonight we plan to install the gully oppisitr Pump Street, install benches and cycle stands and continue with the grouting.



Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street

Monday, 28 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

We have now completed all the slab work throught adn finished installing the bollards to the western footway.

Tonight we plan to continue with the installation of the street furniture and the grouting.




Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street

Friday, 25 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we plan to install bollards and lay slabbing to BT boxes.


Our Public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday-Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out these improvement works to the High Street





 

Thursday, 24 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we plan to complete the slabbing up to Elgar Statue, continue with the grouting and install bollards.


 

Our public Liason Officer for this scheme is Terry Godwin. He will be on site on a regular basis and will be able to answer any questions that you may have. Alternatively, we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
 
We will continue to update this blog on a daily basis (Monday to Friday) so please ensure you visit regularly for information on the progression of this scheme. Information on other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
 
We appreciate your patience and understanding whilst we carry out these improvement works to the High Street.

Wednesday, 23 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Our works planned for tonight, subject to weather, are to lay the remaining slabs ad kerbs, grout all remaining joints; plus start to install street furniture from Jack Wills to Fish Street.



Our Public Liaison Officer for this scheme is Terry Godwin. Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively, we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Tuesday, 22 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we laid slabing to the central area and comlpeted some kerbing by Elgar statue. we were unable to carry out any grouting due to the rain and barriers ahve been left in place to protect the new slabs.

Tonight we plan to complete the kerbing, lay Slabs to the Crown Plaza area, begine the installation of the bollards from Jack Wills to Fish Street. We also plan to grout where possible weather permitting.

 
Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
 
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
 
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street

Monday, 21 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Over the weekend we laid the slabs upto the telephone box and cash point. The grouting was completed to the slabs on the cetral area upto Next, at the Crown Plaza and Fish Street.

Today we are planning to complete the slabs to the central area and continue with the grouting.

 
Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
 
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
 
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street

Friday, 18 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we the slabs were laid upto Slater's and we completed the grouting upto Dorothy Perkins.

Tonight we will plan to lay the slabs up next and ramp, grout upto Slater's and remove the barriers for the weekend.


 
Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street

Thursday, 17 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we were grouting slabs throughout the site.

Tonight we will be continuing the grouting works.


Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street

Wednesday, 16 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we continued with the kerbs to Crown Plaza and continued the slabbing to the central area.

Tonight we will be grouting the slabs throughout the site.


Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street

Tuesday, 15 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we  laid the slabs to the central area and laid the radius kerbs to the Crown Plaza.

Tonight we will be contining with the kerbs to Crown Plaza,grout last night’s slabs and continue slabbing the central area.


Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Monday, 14 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Due to the heavy rainfall, we were unable to complete any works on Saturday night. We were employed on site removing water from the carriageway to ensure against flooding of properties.

Tonight we will plan to lay the slabs to the central area in the vicinity of White Stuff and grout the footway at Crown Plaza.



Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Friday, 11 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we laid the slabs to the central areas at Crown Plaza and Monsoon.

Tonight we will be grouting slabs to enable the removal of barriers and laying slabs to the central section.
 


Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Thursday, 10 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we completed the installation of the Gifas boxes and concrete surrounds, the radius kerbs by the Crown Plaza and the grouting to EWM.

Tonight we will be installing the kerbing upto the Elgar Statue and will be continuing grouting the slabs to Crown Plaza.


Our Public Liason Officer for this scheme is Terry Godwin. Terry will be onsite on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other roadworks throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Wednesday, 9 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we will be excavating the the pits for the Gifas boxes and grouted the slabs from Next to H&M

Tonight we will be laying the kerbing to the top of High Street, laying slabs to the central area & grouting to EWM. The Gifas boxes will be intalled
 
 
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
 
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
 
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Tuesday, 8 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we lowered underground cables and raised all the tree pits up to the new levels.
 
Tonight we will be continuing excavating and laying kerbing and excavating for 2 electrical boxes to be installed.   

Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Monday, 7 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be excavating and lowering electric cables (working with Western Power) across the carriageway to allow the kerbs to be laid and manualy excavating for Gifas Electrical boxes to the central section.

 
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
 
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
 
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Friday, 4 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night the central kerbing was laid upto Next and the slabs laid upto the Crown Plaza entrance.

Tonight we will be completing the slabs in the vicinity of Crown Plaza and EWM and setting the covers and frames to the ironworks.
 

Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Thursday, 3 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night the kerbing was completed up to Fish Street and some pointing was carried out upto H&M.

Tonight we will be continuing with the kerbing and the laying of slabs.


Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Wednesday, 2 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Due to the heavy rain last night, progress was slowed with the works on the High Street.

The works we are planning to carryout tonight, consist of slab laying in the vicinity of Next and H&M, plus laying kerbs on the central kerb line.



Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Tuesday, 1 October 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

The works carried out last night on the High Street consisted of laying slabs from Next up to H&M, pointing a joint at the rear of the slabs next to All Saints Church and excavating trial holes for the central kerb line.

The works scheduled for tonight will consist of continued slab laying in the vicinity of H&M and Crown Plaza, plus start work on the central kerb line.



Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regular basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit this blog regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Monday, 30 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Our works planned for tonight consist of pointing joints between slabs previously laid, excavating trial holes for a new kerb line and depending on what we find with these trial holes, we may also start to excavate the trench for the new kerb line.

Our works scheduled for tomorrow, consist of excavating the trench for the new kerb line in the vicinity of Pump Street and slab laying in the vicinity of Crown Plaza.



Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Friday, 27 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

The works planned for tonight on the High Street, consist of laying slabs in the vicinity of Slaters. Our works will be barriered off from the general public and pedestrian marshals will be on site to assist people if required.

The works scheduled for Saturday night, consist of kerbing in the vicinity of Cathedral Plaza and the pointing of joints from the church to the Indian restaurant.



Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Thursday, 26 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

The works being undertaken on the High Street are proceeding according to schedule. Tonight, 26th September, we shall be laying slabs and pointing the joints between them in the vacinity of Next. As advised yesterday, the works for the remainder of this week will consist of further slab laying and associated activities with this task. Our works will continue to be barriered off from the general public and pedestrian marshals will be on site to assist them past our works if required.



Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Wednesday, 25 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

The works undertaken last night on Worcester High Street, were completed as per our schedule.

The works planned to be carried out tonight, will consist of the laying of slabs in the vacinity of Burtons on the High Street.


Our schedule of works for the remainder of this week, will mainly consist of slab laying and associated tasks with this activity.

Our works will be barried off from the general public and we will have pedestrian marshals on site to assist members of the public if required. Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.

Tuesday, 24 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we carried out works outside the Moroccan resturant, this involved the laying of slabs and pointing of the joints in between them.

Tonight we plan to undertake the layingof slabs and pointing of the joints in between them outside The White Stuff.



Our works will be barriered off from the general public and we will have pedestrian marshals on site to assist members of the public if required.

Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will be updting this blog on a daily basis, (Monday to Friday); so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carryout the improvement works to the High Street.

Monday, 23 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be completing the kerbing from the vicinity of Cathedral Plaza to the Elgar Statue and continuing the grouting to the opposite footpath.

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Friday, 20 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight and Saturday night we will be laying slabs outside Monsoon's and up to the Cathedral Plaza. We will also be continuing the grouting to the opposite footpath from Jack Wills towards Elgar Statue.

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Thursday, 19 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be continuing the excavation and kerb installation from the vicinity of Slaters working towards the Elgar Statue and grouting the opposite footpath.

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Wednesday, 18 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be continuing the excavation and kerb installation from the vicinity of Monsoon working towards the Elgar Statue and preparing the footway joints and ironworks on the opposite footpath for the next days work.
 
 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Tuesday, 17 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be continuing the excavation and kerb installation from the vicinity of Top Man working towards the Elgar Statue and continuing the cutting around the ironworks on the completed footpath.
 
 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Monday, 16 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be completing the cuts in the new footpath around the iron work and will be starting the excavation and kerb installation to the opposite footpath.

 

Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
 
 

Friday, 13 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be completing the slab laying to the western footpath, commence the installation of gullies and complete the cutting around existing pipework.

Tomorrow we plan to install the remaining gullies to the western footpath and remove the street furniture.
 

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Thursday, 12 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be excavating the existing block paving and laying new slabs from Asilah Lounge to the vicinity of Lush.  We will commence the installation of new gully pots adjacent to the newly installed kerbing.
 
 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Wednesday, 11 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight we will be excavating and laying kerbs from Asilah lounge to the vicinity of Lush
 

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Tuesday, 10 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Tonight there will be no works carried out in the High Street.
 
 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Monday, 9 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)


Tonight we plan to excavate, lay kerbs & slabs across Asilah Lounge.
  
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Friday, 6 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we excavated and laid kerbs 1m from Asilah Lounge (Moroccan restaurant) and to slab up to Fish Street.

The planned works for tonight, dependent on the weather,  is to lay slabs up to Asilah Lounge. If inclement, we will be removing the street furniture.

Today we will be re bedding the coping stones by the church

Monday night we plan to excavate, lay kerbs & slabs across Asilah Lounge.
 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Thursday, 5 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Last night we laid kerbing to the south of Fish Street and laid slabs up to St Helen’s Church (All Saints).

The planned works for tonight is to excavate and lay kerbs 1m from Asilah Lounge (Moroccan) and to slab up to Fish Street.

 
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Wednesday, 4 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

Over the first 2 nights of this scheme we have excavated & laid kerbing  upto the church, working from Pump Street end, and laid paving to the footway outside Jack Wills.

Tonight we will be continuing the excavation & kerbing up to Fish Street. We will also be laying slabs to the footway.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.

Monday, 2 September 2013

Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)

The improvement scheme to the High Street, from Pump Street to Elgar's statue, remains on schedule to commence tonight from 6pm. Initially we shall set up our site and works compound, then excavate trial holes to locate underground services before working on the new kerb line on the western side of the High Street.




Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk

We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info

We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.