Our works planned for tonight consist of pointing joints between slabs previously laid, excavating trial holes for a new kerb line and depending on what we find with these trial holes, we may also start to excavate the trench for the new kerb line.
Our works scheduled for tomorrow, consist of excavating the trench for the new kerb line in the vicinity of Pump Street and slab laying in the vicinity of Crown Plaza.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site on a regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
Monday, 30 September 2013
Friday, 27 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
The works planned for tonight on the High Street, consist of laying slabs in the vicinity of Slaters. Our works will be barriered off from the general public and pedestrian marshals will be on site to assist people if required.
The works scheduled for Saturday night, consist of kerbing in the vicinity of Cathedral Plaza and the pointing of joints from the church to the Indian restaurant.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
The works scheduled for Saturday night, consist of kerbing in the vicinity of Cathedral Plaza and the pointing of joints from the church to the Indian restaurant.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
Thursday, 26 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
The works being undertaken on the High Street are proceeding according to schedule. Tonight, 26th September, we shall be laying slabs and pointing the joints between them in the vacinity of Next. As advised yesterday, the works for the remainder of this week will consist of further slab laying and associated activities with this task. Our works will continue to be barriered off from the general public and pedestrian marshals will be on site to assist them past our works if required.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be on site regularly and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
Wednesday, 25 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
The works undertaken last night on Worcester High Street, were completed as per our schedule.
The works planned to be carried out tonight, will consist of the laying of slabs in the vacinity of Burtons on the High Street.
Our schedule of works for the remainder of this week, will mainly consist of slab laying and associated tasks with this activity.
Our works will be barried off from the general public and we will have pedestrian marshals on site to assist members of the public if required. Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
The works planned to be carried out tonight, will consist of the laying of slabs in the vacinity of Burtons on the High Street.
Our schedule of works for the remainder of this week, will mainly consist of slab laying and associated tasks with this activity.
Our works will be barried off from the general public and we will have pedestrian marshals on site to assist members of the public if required. Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will continue to update this blog on a daily basis (Monday to Friday), so please ensure you visit on a regular basis for information on the progression of this scheme. Information on our other road works throughout the County of Worcestershire can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout these improvement works to the High Street.
Tuesday, 24 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Last night we carried out works outside the Moroccan resturant, this involved the laying of slabs and pointing of the joints in between them.
Tonight we plan to undertake the layingof slabs and pointing of the joints in between them outside The White Stuff.
Our works will be barriered off from the general public and we will have pedestrian marshals on site to assist members of the public if required.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will be updting this blog on a daily basis, (Monday to Friday); so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout the improvement works to the High Street.
Tonight we plan to undertake the layingof slabs and pointing of the joints in between them outside The White Stuff.
Our works will be barriered off from the general public and we will have pedestrian marshals on site to assist members of the public if required.
Our Public Liaison Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will be updting this blog on a daily basis, (Monday to Friday); so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carryout the improvement works to the High Street.
Monday, 23 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be completing the kerbing from the vicinity of Cathedral Plaza to the Elgar Statue and continuing the grouting to the opposite footpath.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Friday, 20 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight and Saturday night we will be laying slabs outside Monsoon's and up to the Cathedral Plaza. We will also be continuing the grouting to the opposite footpath from Jack Wills towards Elgar Statue.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Thursday, 19 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be continuing the excavation and kerb installation from the vicinity of Slaters working towards the Elgar Statue and grouting the opposite footpath.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Wednesday, 18 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be continuing the excavation and kerb installation from the vicinity of Monsoon working towards the Elgar Statue and preparing the footway joints and ironworks on the opposite footpath for the next days work.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Tuesday, 17 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be continuing the excavation and kerb installation from the vicinity of Top Man working towards the Elgar Statue and continuing the cutting around the ironworks on the completed footpath.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Monday, 16 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be completing the cuts in the new footpath around the iron work and will be starting the excavation and kerb installation to the opposite footpath.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Friday, 13 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be completing the slab laying to the western footpath, commence the installation of gullies and complete the cutting around existing pipework.
Tomorrow we plan to install the remaining gullies to the western footpath and remove the street furniture.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Tomorrow we plan to install the remaining gullies to the western footpath and remove the street furniture.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Thursday, 12 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be excavating the existing block paving and laying new slabs from Asilah Lounge to the vicinity of Lush. We will commence the installation of new gully pots adjacent to the newly installed kerbing.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Wednesday, 11 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we will be excavating and laying kerbs from Asilah lounge to the vicinity of Lush
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Tuesday, 10 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight there will be no works carried out in the High Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Monday, 9 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Tonight we plan to excavate, lay kerbs & slabs across Asilah Lounge.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Friday, 6 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Last night we excavated and laid kerbs 1m from Asilah Lounge (Moroccan restaurant) and to slab up to Fish Street.
The planned works for tonight, dependent on the weather, is to lay slabs up to Asilah Lounge. If inclement, we will be removing the street furniture.
Today we will be re bedding the coping stones by the church
Monday night we plan to excavate, lay kerbs & slabs across Asilah Lounge.
The planned works for tonight, dependent on the weather, is to lay slabs up to Asilah Lounge. If inclement, we will be removing the street furniture.
Today we will be re bedding the coping stones by the church
Monday night we plan to excavate, lay kerbs & slabs across Asilah Lounge.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Thursday, 5 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Last night we laid kerbing to the south of Fish Street and laid slabs up to St Helen’s Church (All Saints).
The planned works for tonight is to excavate and lay kerbs 1m from Asilah Lounge (Moroccan) and to slab up to Fish Street.
The planned works for tonight is to excavate and lay kerbs 1m from Asilah Lounge (Moroccan) and to slab up to Fish Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Wednesday, 4 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
Over the first 2 nights of this scheme we have excavated & laid kerbing upto the church, working from Pump Street end, and laid paving to the footway outside Jack Wills.
Tonight we will be continuing the excavation & kerbing up to Fish Street. We will also be laying slabs to the footway.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Tonight we will be continuing the excavation & kerbing up to Fish Street. We will also be laying slabs to the footway.
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Monday, 2 September 2013
Worcester High Street Improvement Scheme - (Pump Street to Elgar Statue)
The improvement scheme to the High Street, from Pump Street to Elgar's statue, remains on schedule to commence tonight from 6pm. Initially we shall set up our site and works compound, then excavate trial holes to locate underground services before working on the new kerb line on the western side of the High Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Our Public Liasion Officer for this scheme is Terry Godwin, Terry will be visiting site on a daily basis and he will be able to answer any questions that you may have. Alternatively we can be contacted on our Customer Care Line 01905 761176 or by email roadworks.info@ringway.co.uk
We will update this blog on a daily basis, Monday to Friday, so please ensure you visit regularly for information on the progression of this scheme. Information on our other road works can be found on our Twitter feed www.twitter.com/roadworks_info
We appreciate your patience and understanding whilst we carry out the improvement works to the High Street.
Subscribe to: